Description: As a first step of Metered Service Bill Segment calculation, CC&B determines consumption to be billed. The system determines the Bill Period boundary, and next determines the Consumption Period boundary. The system retrieves appropriate Service Point, Meter, and associated Meter Reads. Meter Reads determine the start and end date for the Bill Segment Consumption Period.
Manual Process: CSR or Authorized User provides the Bill period details if required. If not, the system defaults Bill period dates following the business rules:
Automated Process: System identifies start and end date for the billing period using the same business rules as described in manual process.
Note: Every SA type defines the minimum number of days on a Bill Segment. Whenever the system attempts to create a Bill Segment other than the final Bill Segment, it checks if the number of days is at least as great as the minimum defined on the SA type.
Note: The system ignores Service Points that are not billable, disconnected before the Bill period started, or are yet to be connected as of the Bill end date.